Unverified50% confidenceSolutionExact time
The positive outcome of ADR 1 (adopting a central model allowlist) is that compliance and permissions have a single source of truth, and the negative outcome is that model deprecation or additions require coordination, and request latency increases slightly due to the lookup.
1
Sources
50%
Confidence
Long-term
Relevance
10/14/2026
First Seen
Sources
Related Entities
Related Claims
UnverifiedThe acceptance criteria of ADR 001 require: 95% of requests complete within the latency SLA of their assigned tier; the average daily compute cost is reduced by ≥ 30% compared with the single-model baseline; and policy violation incidents do not increase after introducing the escalation mechanism.72% similarUnverifiedModel-centric monitoring metrics (token consumption, model latency, request volume, error rates, prompt and response tracing) are still useful, but they cannot fully explain a multi-agent business process.66% similarUnverifiedThe more independent requirements included in a single prompt, the more the probability of the model omitting or incorrectly implementing certain requirements grows non-linearly; the MVP strategy improves reliability by narrowing the model's decision space.66% similarUnverifiedFor predictive variance, when c < 1 the variance retains the prior value, when c = 1 the variance matches the NNGP posterior variance, and when c > 1 the variance tends to vanish.65% similarVerified若用含测试集的全量数据计算均值和标准差,会导致预处理泄漏,使评估指标虚高,无法真实反映模型泛化能力64% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/1024213API
curl https://kongchang.com/api/v1/knowledge/claims/1024213MCP
get_claim(id=1024213)