Unverified50% confidenceFactExact time
Assuming the agent has a 90% correctness rate per step, chaining 3 steps yields a 73% success rate (0.9^3), 5 steps 59% (0.9^5), and 10 steps 35% (0.9^10).
1
Sources
50%
Confidence
Long-term
Relevance
10/18/2026
First Seen
Sources
Related Entities
Related Claims
VerifiedIn a 10-step engineering task where each step has a 90% success rate, the overall task completion rate is approximately 35%; if each step's success rate is raised to 99%, the overall success rate jumps to 90%.78% similarVerified如果一个10步操作中每步准确率为95%,整体成功率仅约60%78% similarUnverified假设每步成功率为95%,在一个50步会话中整体成功率约为0.95^50≈8%78% similarUnverifiedIn a five-step sequential operation, even if each step has a 95% accuracy rate, the probability of all five steps being correct is approximately 77% (0.95⁵ ≈ 0.774).77% similarVerifiedAgents suffer from error accumulation in multi-step tasks; a ten-step sequential process where each step has 95% accuracy results in an overall success rate that drops to approximately 60%.75% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/1060962API
curl https://kongchang.com/api/v1/knowledge/claims/1060962MCP
get_claim(id=1060962)