Unverified50% confidenceDecision RuleExact time
A live process does not mean work is normal: a stuck daemon retains its PID, memory and state, so you should test on the actual work path rather than merely checking the process table.
1
Sources
50%
Confidence
Long-term
Relevance
10/19/2026
First Seen
Sources
Related Entities
Related Claims
UnverifiedTraditional CI pipelines can report whether unit tests pass and whether builds succeed, but cannot directly demonstrate how features perform during actual user usage.68% similarUnverifiedEnd-to-end checks must cover the entire feature rather than each individual task, and must be locked in before work begins, to prevent a situation where all individual ticket tests pass but the feature as a whole is still broken.68% similarUnverifiedThe system inspects the implementation plan itself during the review stage, rather than waiting until after the code is written to conduct a review.68% similarUnverifiedThe workflow uses a status check mechanism: before execution it checks whether the row's Status is already "done", and if so skips processing, avoiding wasted AI quota and duplicate content generation caused by repeated runs.68% similarUnverifiedThe number of slots in test cases should be kept in sync with the schedule table, to avoid tests still validating the old structure after new tasks are added.68% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/1066210API
curl https://kongchang.com/api/v1/knowledge/claims/1066210MCP
get_claim(id=1066210)