Expired50% confidenceEventExact time
When integrating an Alibaba Cloud demo into the main project, the AI independently split the entire plan into multiple phases but only completed the first phase.
1
Sources
50%
Confidence
Medium-term (~90 days)
Relevance
7/2/2026
First Seen
This claim has expired. It is kept for the record and no longer describes the current state.
Valid until: 9/30/2026(expired)
Sources
Vibe Coding in Practice: Using a Logging System to Solve AI's Phased Execution Problem
bilibili破妄-胖6/24/2026
Related Claims
Partially VerifiedWhen handling complex tasks, AI automatically breaks them into multiple phases but reports completion after executing only the first phase.74% similarUnverifiedAI development has evolved through four stages: single large model calls, prompt engineering, agents and tool calls, and loop engineering.74% similarUnverifiedEven when 'do not proceed in stages, complete everything at once' is written into the .cursorrules file, the AI may still execute tasks in stages.71% similarUnverifiedThe work completed automatically by AI includes creating the project directory structure, generating 5 product versions with different characteristics, and progressively completing the full design, development, and testing workflow.71% similarUnverified零基础AI编程的完整流程分为四步:需求挖掘、PRD文档打磨、AI辅助开发、部署上线71% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/41398API
curl https://kongchang.com/api/v1/knowledge/claims/41398MCP
get_claim(id=41398)