Unverified60% confidenceFactExact time
The ITER International Thermonuclear Experimental Reactor costs 22 billion euros.
2
Sources
60%
Confidence
Medium-term (~90 days)
Relevance
9/6/2026
First Seen
Valid until: 12/5/2026
Sources
Related Entities
Related Claims
UnverifiedITER (International Thermonuclear Experimental Reactor) is expected to achieve full-power operation in 2035.67% similarUnverified电子-离子对撞机(EIC)是美国布鲁克海文国家实验室正在建设的下一代核物理设施,预计2030年代初投入运行,预算约20亿美元56% similarUnverifiedTraditional nuclear power plants routinely have installed capacities of one million kilowatts or more.54% similarUnverifiedIn July 2023, Lockheed Martin was awarded a contract of approximately $499 million to build the ARIES experimental flight vehicle equipped with a nuclear thermal rocket engine, with the nuclear fission reactor designed and manufactured by BWX Technologies using HALEU fuel.53% similarUnverifiedNuclear fuel accounts for approximately 10%–15% of the total operating costs of a nuclear power plant.51% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/864847API
curl https://kongchang.com/api/v1/knowledge/claims/864847MCP
get_claim(id=864847)