Unverified50% confidenceReleaseExact time
Sub-agents that stop upon reaching the maxTurns limit will now return output marked as partially completed with a prompt that continuation is available via SendMessage
1
Sources
50%
Confidence
Medium-term (~90 days)
Relevance
9/11/2026
First Seen
Valid until: 12/10/2026
Sources
Related Entities
Related Claims
UnverifiedAgent Loop的终止条件通常是LLM不再产生工具调用请求,或达到最大步骤限制(max_iterations)68% similarUnverifiedCommon termination strategies for Agent Loop include three layers: semantic termination (such as detecting the Final Answer marker), an iteration limit (max_iterations typically defaults to 10–15), and timeout protection (the timeout parameter).66% similarUnverifiedStreaming execution allows the Agent to output intermediate results in real time, and checkpoint & resume ensures that long-running tasks can continue from the last interruption point when a failure occurs65% similarUnverifiedThe Max rework runs parameter controls the maximum number of rework attempts for a single task; once exceeded, the system marks the task as blocked for manual handling.64% similarUnverifiedWhen using the legacy Agent, one should set max_iterations to prevent infinite loops, set timeouts, add early_stopping_method=generate, add input validation to tools, and integrate LangSmith for full-chain tracing.63% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/897998API
curl https://kongchang.com/api/v1/knowledge/claims/897998MCP
get_claim(id=897998)