Verified80% confidenceDecision RuleExact time
If a project has both ai and @ai-sdk/workflow pinned, both should be updated together to avoid type or runtime errors caused by version mismatches.
4
Sources
80%
Confidence
Medium-term (~90 days)
Relevance
9/15/2026
First Seen
Valid until: 12/14/2026
Sources
Related Entities
Related Claims
UnverifiedThe author recommends that developers keep the versions of @ai-sdk/tui and the main package ai in sync to avoid version mismatch issues.76% similarUnverifiedIt is recommended to run the full test suite after upgrading, especially when the project simultaneously locks the versions of related dependencies such as ai and @ai-sdk/provider.76% similarVerifiedWhen upgrading, you should confirm whether the ai core package version in the project needs to be simultaneously upgraded to 7.0.94 to avoid runtime errors caused by version mismatches.76% similarUnverifiedIn a monorepo coordinated release setup, mixing different major versions of the ai package and @ai-sdk/svelte may cause type mismatches or abnormal runtime behavior.75% similarUnverifiedMixing different versions of the workflow, ai, and provider packages may cause type mismatches or runtime exceptions; it is recommended to use a lock file to upgrade the entire SDK ecosystem uniformly.75% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/921896API
curl https://kongchang.com/api/v1/knowledge/claims/921896MCP
get_claim(id=921896)