Unverified50% confidenceOpinionExact time
The model release cycle is approximately two months, while the timespan over which models work effectively continues to extend, leaving labs insufficient time to evaluate models across their full capability range.
1
Sources
50%
Confidence
Medium-term (~90 days)
Relevance
9/18/2026
First Seen
Valid until: 12/17/2026
Sources
Related Entities
Related Claims
UnverifiedA full round of model evaluation often requires 2–4 weeks of dedicated engineering time.77% similarUnverifiedOn top of mastering the basics of Agent development, large model secondary development requires approximately two more months of spare time, and together the two parts take roughly three months to cover the entire application development direction.74% similarUnverifiedThe time required to build a model with Model Connect depends on the model size; small models finish in one to two minutes, while larger models may take up to 45 minutes.74% similarUnverifiedLLMs have lowered the barrier to experimentation through readily available open-source models and APIs, enabling researchers to complete in a few weeks experimental workflows that previously took months.71% similarUnverifiedSystematically learning large model development requires at least 2–3 months of continuous study, even with a daily investment of 3–4 hours.70% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/931023API
curl https://kongchang.com/api/v1/knowledge/claims/931023MCP
get_claim(id=931023)