Unverified60% confidenceFactExact time
Between 2023 and 2024, the delivery lead time for NVIDIA H100s once reached 36–52 weeks; by the second half of 2025, GPU availability improved significantly as TSMC expanded its CoWoS advanced packaging capacity.
2
Sources
60%
Confidence
Long-term
Relevance
8/31/2026
First Seen
Sources
Related Entities
Related Claims
UnverifiedGPU短缺问题在2023至2024年间曾导致H100交货周期长达数月78% similarUnverified2024年以来大模型的发布频率已从按季度演变为按周甚至按天67% similarUnverified全球GPU供应紧张的局面在2023-2024年持续存在,推高了算力获取成本66% similarUnverifiedIt is expected that by 2026–2027, as terminal chip processes advance to 2nm and NPU architectures are optimized, terminal devices are expected to run tens-of-billions-parameter-scale models smoothly.66% similarUnverified2022年美国商务部将英伟达A100、H100等高端GPU列入对华出口限制清单,英伟达随后推出A800/H800,但2023年底这批产品也遭禁售65% similar
Cite This Claim
Stable URI
https://kongchang.com/claim/833216API
curl https://kongchang.com/api/v1/knowledge/claims/833216MCP
get_claim(id=833216)